Optimal scheduling of manufacturing processes across multiple production lines by polynomial regression and bagged bounded binary knapsack

Egileak: Aritz Legarretaetxebarria Torrealda Marco Quartulli Igor García Olaizola Mikel Serrano Almuiña

Data: 27.11.2015


PDF

Abstract

The sensorisation of manufacturing operations in ‘Industry 4.0’ implies the possibility of pursuing scheduling optimisations across multiple lines. The present contribution introduces an attempt toward this objective that focuses methodologically on polynomial regression and bagged bounded binary knapsack. Results are evaluated on real data from a sensorised metal injection molding plant.

BIB_text

@Article {
title = {Optimal scheduling of manufacturing processes across multiple production lines by polynomial regression and bagged bounded binary knapsack},
keywds = {

optimization, scheduling


}
abstract = {

The sensorisation of manufacturing operations in ‘Industry 4.0’ implies the possibility of pursuing scheduling optimisations across multiple lines. The present contribution introduces an attempt toward this objective that focuses methodologically on polynomial regression and bagged bounded binary knapsack. Results are evaluated on real data from a sensorised metal injection molding plant.


}
isbn = {978-2-9548927-1-9},
date = {2015-11-27},
year = {2015},
}
Vicomtech

Gipuzkoako Zientzia eta Teknologia Parkea,
Mikeletegi Pasealekua 57,
20009 Donostia / San Sebastián (Espainia)

+(34) 943 309 230

close overlay